How to Calculate Knitting Cost per kg in Textile Industry?

How to Calculate Knitting Cost per kg in the Textile Industry?

Knit Fabric Cost and Knitting Cost Calculation per kg:

Knitting cost calculation is too important to achieve greater output in the textile business. Coz it is very competitive in the textile market. It is not an easy task that we normally do. This article will help you to learn the exact calculating method for knit fabric cost and knitting rate calculation. Here we are discussing how to Calculate Knitting Cost per kg in the Textile Industry.

Knit is cheaper than woven, so businessmen choose to go for the knitting business over woven. Here, every single penny matters. So it is a very important thing to know how to calculate knitting costs.

How to Calculate Knitting Cost per kg in Textile Industry

Knitting Cost Calculation Method in the Textile Sector:

Find out the knitting cost & rate and knitted fabric cost & price from the chart below.

ParametersAmount or Quantity
Total machine2
Shift per day3
Production capacity per shift70kg per machine
Yarn used1000kgs
Yarn priceRs. 200 per kg
Knitting wastage2%
Operator wagesRs. 200 per shift
Helper wages (In production)Rs. 100 per shift
Inspection wagesRs. 200 per shift
1 helper2 machines
1 operator1  machine
Inspection worker1 person
PowerRs. 4000 per month
RentRs. 8000 per month
TransportRs. 6000 per month
SalaryRs. 25000 per month
Other expensesRs. 24000 per month
Profit10%

Solution:

To calculate the knitting cost and rate, we have to follow the formulas below for knitting cost calculation per kg basis:

1. Fabric Manufacturing and Selling Cost Calculation:

Knit fabric cost/kg,

     Direct material (D.M) + Direct labor (D.L) + Direct expenses (D.E) + Overhead (OH)

…………………………………..………………………………………..…………………….…      ….(1)

                                                      Total production

2. Knit Fabric Manufacturing Cost calculation:

Knitting cost/kg,

     Direct labor (D.L) + Direct expenses (D.E) + Overhead (OH)

……………………………………………………………………………        ………….. (2)

                                  Total production

Total Production Calculation:

Total production,

= Yarn used –wastage%

= 1000-2%

= 1000-20

= 980kg

Total Production Time Calculation:

Total production time = Total production/production capacity per shift …………………… (3)

Now,

Production capacity/shift,

= No. of machines × capacity 

= 2×70

= 140kg

Now, from equation (3), we get,

Total production time,

= 980/140

= 7 shift

Direct Material (D.M) Cost calculation:

Yarn cost,

= 1000 × Rs. 200

= Rs. 200000

Direct Labor (D.L) Cost calculation:

Operator wage = No. of operator × No. of shifts × Rs. 200 = 2×7×200 = Rs. 2800

Helper wage = No. of helper × No. of shifts × Rs. 100 = 1×7×100 = Rs. 700

Inspection wage = No. of inspector × No. of shifts × Rs. 100 = 1×7×200 = Rs. 1400

So, 

Direct labor (D.B) cost,

= Rs. 2800+ Rs. 700+ Rs. 1400

= Rs. 4900

Direct Expense (D.E) Cost Calculation:

Direct expense = 0

Overhead (OH) Cost Calculation:

In the case of power,

= (Cost × 7 shifts)/ (30days× 3 shifts in a day) = {(4000×7)/90} = Rs. 311

In the case of rent,

= (Cost × 7 shifts)/ (30days× 3 shifts in a day) = {(8000×7)/90} = Rs. 622

In the case of transport,

= (Cost × 7 shifts)/ (30days× 3 shifts in a day) = {(6000×7)/90} = Rs. 467

In the case of salary,

= (Cost × 7 shifts)/ (30days× 3 shifts in a day) = {(25000×7)/90} = Rs. 1944

In case of others expense,

= (Cost × 7 shifts)/ (30days× 3 shifts in a day) = {(24000×7)/90} = Rs. 1867

So,

Total overheads,

= Rs. 311+ Rs. 622+ Rs. 467+ Rs. 1944+ Rs. 1867

= Rs. 5211

Now, from equation (1), we get,

Knit fabric cost/kg,

= {(200000+4900+0+5211/980)} = Rs. 214.40

After adding 10% profit, knit fabric cost stands at,

= {214.40/ (1-10%)}

= Rs. 238.20

Again,

From equation (2), we get,

Knitting rate or knitting cost per kg,

= {(4900+0+5211)/980}

= Rs. 10.30

After adding 10% profit, the knitting rate stands at

= {10.30/ (1-10%)}

= Rs. 11.45